The integrated head package has been installed on top of the reactor pressure vessel of unit 1 of the Sanmen nuclear power plant in China's Zhejiang province. Sanmen 1 is expected to be the first Westinghouse AP1000 to begin operating.
http://www.world-nuclear-news.org/NN-Integrated-head-package-in-place-at-Sanmen-1-1403164.html
No comments:
Post a Comment